Commissioning offshore cranes in South Korea

PR-2007-01
Shipbuilding — offshore cranes
Oct 2007 – Mar 2012

01 Challenge

Each newly installed crane had to be started, tested, adjusted and handed over, with electrical, software and hydraulic systems working together.

02 Solution

With a colleague on the opposite rotation, I supervised testing personnel and worked on PLC networks, control software, sensors and hydraulics, tracing faults through the complete system.

03 Result

Our team prepared, tested and commissioned approximately 100 cranes over several years.

Sector
Shipbuilding — offshore cranes
Period
Oct 2007 – Mar 2012
Role
PLC programmer and hydraulic engineer
Location
South Korea
  • PLC programming
  • Electronics